With the basic needs of hospital, a 10 unit dentistry center was added to the design. Because of the height of the water level in the site, the basement was not designed. That results a heavy and wide ground floor, spread all the area on the site. On the other hand, the “tear drop” form of Hospital Wards gives an elegant look and vertical movement to the project.
Location / PLC: Samsun, Turkey
Employer / CLT: TC Ministry of Health
Construction Area / GBA: 16,250 m2
Land Area / LA: 23,000 m2
Projecting Date / DATE: 2012