With the basic needs of hospital, a 10 unit dentistry center was added to the design. Because of the height of the water level in the site, the basement was not designed. That results a heavy and wide ground floor, spread all the area on the site. On the other hand, the “tear drop” form of Hospital Wards gives an elegant look and vertical movement to the project.

Location / PLC: Samsun, Turkey

Employer / CLT: TC Ministry of Health

Construction Area / GBA: 16,250 m2

Land Area / LA: 23,000 m2

Projecting Date / DATE: 2012

Benzer Projelerimiz